Home | Research | Delivery | Empennage | Wings | Fuselage | Finish | Engine | Electrical | GRTDecode

Fri 06 October 2006

Sorted the central bauden cable with an adel clamp on the sub panel. The right cable is going to be more of a problem - the tray gets in the way - thought needed.
The third iteration of the idea / bracket. Looks promising need to wait to work the cables / check final fitting.
2 hours this afternoon was spent getting the inboard bolt into the P1 stick weldment. After finally sorting it - I released I missed the aileron trim bracket which reqires removing the bolt! DOH! Time for a beer.
Carl Morgan